The American River Current

The Technical Education area at American River College is under construction and there is fencing around the area. Demolition has started and the project is scheduled to be done in fall 2024. (Photo by Heather Amberson)

Technical Education area at ARC is under construction

Heather Amberson, Editor-in-Chief October 4, 2022

The Technical Education area at American River College is currently under construction and is surrounded by fencing. Demolition has started and the project is scheduled to be done by fall 2024.  According...

Students of the drone class, Experimental Offering in Design Technology, gather around Sean Franklin (left), who describes the various operations that are available in the drone unit they were flying in the Student Center at American River College on Feb. 2, 2019.

Take This Class: Experimental Offering in Design Technology (DESGN 299)

Patrick Hyun Wilson February 13, 2019

The sound of mechanical buzzing fills the air in the Student Center at American River College. Plastic propellers zip around the room as different groups of students control their movement. Occasionally...

Load More Stories
Activate Search
electronics